Weekly SWOT for year 2

17/10/2011
Strengths:
·         I have a clear idea on the design
·         I have improved my drawing skills through practice and found a style I like
Weaknesses:
·         My drawing isn’t as strong as it could be, therefore could take time to get it right
·         Become confident with illustrator
Opportunity’s:
·         To learn new skills within CAD
Threats:
·         Learning how to balance all of the projects
·         To get back on track with the work load


24/10/2011
Strengths:
·         I have a strong concept
·         I have gained a lot of research
·         My design is finalized therefore I know how my patterns should look
Weaknesses:
·         I still have a lot of final touches to do on my sketchbook
Opportunity’s:
·         I can progress my pattern cutting skills
Threats:
·         I don’t have a lot of time to finish my sketchbook for the deadline


31/10/2011
Strengths:
·         My pattern cutting skills are improving
·         My garment construction is progressing well
Weaknesses:
·         I have a lot of things to get done, so need to be more organized
Opportunity’s:
·         Improving my drawing skills through life drawing
·         Gaining experience and a new skill through life drawing
Threats:
·         Problem solving for the metal could take numerous attempts
There is still a lot to do before the deadline


07/11/2011
Strengths:
·         I have a knowledge of how the UCAS application process works
·         My toile is on schedule
·         I have made many metal toiles
Weaknesses:
·         I don’t have full control over the metal skirt working
·         I need to be more organized with the photo quality of my images for my pattern cutting diary
Opportunity’s:
·         I am learning about the metal workshop
Threats:
·         The metal could go wrong

 
14/11/2011
 Strengths:
·         Dress is on schedule and there is no need to do another toile
Weaknesses:
There is quite a lot to change in the pattern 
Opportunitys:
   I am learning about the metal workshop
Threats:
 The metal structure could easily go wrong


21/11/2011

Strengths:
·         After numerous attempts on personal statement, I have nearly finished it
·         Deadline for personal statement is not for a few weeks
Weaknesses:
·         I have not yet found fabric for my belt
Opportunity’s:
·         Hopefully perfecting my personal statement will allow me further opportunity’s in further education
Threats:
·         Using my actual fabric could work differently to the toile fabric


28/11/2011
Strengths:
·         The metal structure is working well
Weaknesses:
·         The dress isn’t working as well as it did in the toile
Opportunity’s:
·         I am learning how to do a costing sheet correctly which is something I will need to know for industry
Threats:
·         The fabric working correctly

 
5/12/2011
Strengths:
·         Garment has worked out in the end after problem solving
Weaknesses:
·         Garment is very gathered which will be difficult to press
Opportunity’s:
·         After finishing my garment a little early it will give me time to completely prepare for deadline
Threats:
·         There were no threats due to everything being completed 

 
12/12/2011

Strengths:
·         I am quite comfortable using illustrator
Weaknesses:
·         I haven’t used illustrator for a few months
Opportunity’s:
·         Gain more skills on illustrator
·         Network on my blog
Threats:
·         Illustrator is only available at college


Over the Christmas holidays-
 
Strengths:
·         My knowledge of Cad is improving
·         I have gained a lot of development work for my file due to a lot of experimentation
Weaknesses:
·         I still need a lot of research for my CAD file
Opportunity’s:
·         Working over the holidays will allow me to be ahead of schedule
 Threats: 
  Illustrator is only available at college



2/01/2012-
Strengths:
·         I have begun considering my personal statement
·         I keep a keen up to date knowledge of trends
Weaknesses:
·         I don’t have a lot of research into look books
Opportunity’s:
·         The trend book will be included in a goodie bag at Newcastle fashion week
Threats:
·         We need to really consider how the look book will look as it’s not in our hands because the graphics students are putting it together so we need to have a good selection of research

 
9/01/2012-
Strengths:
·         I have a concept for my final major
·         I am becoming stronger with illustrator
Weaknesses:
·         Illustrator is only available at college
Opportunity’s:
·         The shoot is an excellent opportunity to work with another type of student
·         I am able to fully create the image I want with my photo shoot and create an interesting selection of images which will be shown in a look book
Threats:
·         I need to consider everything in the shoot with it being on location as a lot of things could go wrong

 
16/01/2012-
Strengths:
·         My boards are nearly done
·         I have developed a lot within illustrator
Weaknesses:
·         Illustrator is only available at college
·         I have numerous ideas for the shoot
Opportunity’s:
·         I am able to completely explore with the location etc. for my shoot
Threats:
·         I need to consider everything in the shoot with it being on location as a lot of things could go wrong


23/01/2012-
Strengths:
·         I have been very organized throughout the CAD and have many screen shots which will show my development well
Weaknesses:
·         My essay is still not finished and needs work
Opportunity’s:
·         My skills have progressed a lot through this module which will benefit me in industry as CAD is very important
Threats:
·         The deadline is approaching quickly


30/01/2012-
 
Strengths:
·         I have decided on my definite idea for final major
Weaknesses:
·         I don’t know what a statement of intent is at this current time
·         My portfolio is very full and not specific enough
Opportunity’s:
·         Opportunity for a top up degree
Threats:
·         To be prepared for interview and ensure I include the right things

 
6/02/2012-
Strengths:
·         Due to doing the Cad module my skills have improved a lot which means I now have to knowledge to really experiment on CAD
Weaknesses:
·         I need to really consider what pieces of work will look best in my portfolio specific for the course
Opportunity’s:
·         Opportunity to go into second year to complete my degree
Threats:
·         To be prepared for interview and ensure I include the right things


13/02/2012-
Strengths:
·         I have a very clear idea of my design so know what im doing to start pattern cutting
Weaknesses:
·         I need to really consider what pieces of work will look best in my portfolio specific for the course
·         It’s a fashion marketing course which I haven’t studied fully
Opportunity’s:
·         Opportunity to go into second year to complete my degree
Threats:
·         To be prepared for interview and ensure I include the right things



20/02/2012-
Strengths:
·         I have sampled many fabrics and know which one I want
·         My pattern cutting is on schedule
Weaknesses:
·         I can’t find my fabric in yellow anywhere
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
Threats:
·         The dress might not fit the model

 
27/02/2012-
Strengths:
·         The first toile gained my basic shape
·         I have completely decided on everything for my shoot
Weaknesses:
·         There is a lot of altering to do to my first toile
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
·         The shoot is going to be very important to get good shots for the look book
Threats:
·         There are a lot of things that could go wrong on the shoot
·         The second toile might not work and could set me back for time

 
5/03/2012-
Strengths:
·         The second toile gained my more shape to my dress and is starting to look like what I wanted
·         I have completely decided on everything for my shoot and negotiated with the model and photographer
Weaknesses:
·         There is still some altering to do on my toile
·         I have never used the computerized embroidery machine
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
·         The shoot is going to be very important to get good shots for the look book
·         I will gain another skill learning how to use the computerized embroidery machine
Threats:
·         There are a lot of things that could go wrong on the shoot
·         The second toile hasn’t completely worked which could set me back for more time because I will have to make another one

 
 
12/03/2012-
Strengths:
·         After making 2 toiles I am very familiar with altering my pattern pieces
·         I know how to use illustrator which will work well with trying to get the right shapes for the butterfly
Weaknesses:
·         There is still some altering to do on my toile
·         I have never used the computerized embroidery machine and the programs that go along with it
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
·         I will gain another skill learning how to use the computerized embroidery machine
Threats:
·         The third toile might also not be ideal


 
19/03/2012-
Strengths:
·         I am very familiar with my toile at this stage in the garment construction
·         The butterfly is looking very suitable to my idea
Weaknesses:
·         There is still some altering to do on my toile
·         I have never used the computerized embroidery machine and the programs that go along with it
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
·         I will gain another skill learning how to use the computerized embroidery machine
Threats:
·         Even though I have experimented a lot with the butterfly it could still go wrong at the embroidery stage


26/03/2012-
Strengths:
·         I have worked hard on my butterfly design
Weaknesses:
·         I have never used the computerized embroidery machine and the programs that go along with it
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
·         I will gain another skill learning how to use the computerized embroidery machine
·         My photos will go into the look book
Threats:
·         Even though I have experimented a lot with the butterfly it could still go wrong at the embroidery stage
·         The weather could be bad on the day of the shoot
·         The location for the shoot is very unpredictable

 

2/04/2012-
Strengths:
·         The embroidery worked well on the wings therefore should be successful for the panel
·         I have had numerous interviews now so I do feel more confident
·         I worked hard on my toile therefore the dress should sew up well
Weaknesses:
·         I have never used the computerized embroidery machine and the programs that go along with it
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
·         I will gain another skill learning how to use the computerized embroidery machine
·         My photos will go into the look book therefore I want them to be edited to look the best they can
·         The opportunity to be accepted into a second year degree program at sunderland
Threats:
·         Even though I have experimented a lot with the butterfly it could still go wrong at the embroidery stage particularly with the panel as it needs to be very precise
·         The editing could look different when printed out

9/04/2012-
Strengths:
·         I am very close to finishing my negotiated project
·         My blog is up to date
·         My dress is on target with my critical path
Weaknesses:
·         I am balancing numerous projects and could be more effective with my time management
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
·         My photos will go into the look book therefore I am really experimenting with my negotiation project as I need them to look the best they can
Threats:
·         The printer could break
·         There is still room for error in my dress


16/04/2012-
Strengths:
·         I am ahead of my critical path in regards to my dress
Weaknesses:
·         I still have a lot of work to finish and print for my PPD file
Opportunity’s:
·         The dress is starting to become a reality and will have the chance to be in ncl fashion week
Threats:
·         The printer could break
·         The length of my hem (as it needs to be perfect to really allow my dress to be exactly what I wanted)